An effective runway is the first point of contact with air travel safety. How seamlessly airplanes fly on your canvass boost your customers’ confidence in your airport and airplane operations. Rough and edgy runways are unfortunately the sourest recipes for fright and boarding discomfort. Slopes, water and moisture can cause gradual decay on runways. However, proper management and rejuvenation plans help clean up the mess, and your runways will never fail again. We offer the right materials in the right quantity and applications to get your runways working again.
Benefits Of Rejuvenation Over Re-Surfacing Of Runway:
a) Availability of runway: rejuvenation work is normally completed in a period of 15 to 20 days and the runway is also available for use during rejuvenation work, whereas in resurfacing, non-availability of runway affects flight schedule, training exercises and the tourism industry also, if the runway is used jointly by civilian airlines.
b) Rejuvenation work involves a minor cost and that too in stages, whereas resurfacing cost is quite high and that too in bulk.
c) Extensive tests are carried out before and after treatment. application of rejuvenator on runway surface is evaluated / tested through following three critical parameter
• Friction coefficient
• Permeability
• Mean textured depth (mtd).
d) Application of XL -Emulcote rejuvenator has resulted in improvement of friction coefficient to bring it within acceptable limits. The permeability of the surface has exhibited improvement by up to 30-50%. The surface texture has shown improvement by upward of 20% of mtd. Overall, post application of rejuvenator the surface has shown substantial of improvement based on field tests conducted.